
The details, clearly.
- Developer
- EL Development (Buona Vista) Pte Ltd and EL Development (One-North) Pte Ltd
- Address
- 9 Slim Barracks Rise, Singapore 139742
- District
- D05
- Tenure
- 99 years leasehold from 10 January 2022
- Site Area
- 7,957.3 sqm
- Plot Ratio
- 3.0
- Blocks and Storeys
- 1 block of 27-storey residential development with commercial units on B1, level 1 and level 2, plus two basement carpark levels
- Total Units
- 275 residential units and 1 commercial lot
- Carpark
- Refer to source sales pack
- Expected TOP
- Expected vacant possession 31 December 2027
- Launch date
- Not stated in available source files
- Architect
- ADDP Architects LLP
- Main Contractor
- Evan Lim & Co. Pte Ltd
- Quantity Surveyor
- Evan Lim & Co. Pte Ltd
- C&S Engineer
- E2000 Pte Ltd
- M&E Engineer
- Conteem Engineers Pte Ltd
- Interior Designer
- Design Inck Pte Ltd
- Landscape Architect
- Ecoplan Asia Pte Ltd
A closer look at the neighbourhood.
Location and Connectivity

Schools Nearby
| Primary / Nearby | Fairfield Methodist School (Primary), Henry Park Primary School, New Town Primary School |
|---|---|
| Secondary / Tertiary | Anglo-Chinese Junior College |
| Distance note | School distance and priority admission should be re-checked against OneMap and current MOE rules before purchase. |
Lifestyle and Amenities
Daily Convenience
50m Lap Pool, Wellness Pool
Outdoors
Kid's Pool, BBQ Pavilion
Dining
Family Pavilion, Water Pavilion
Retail
Viewing Pavilion, Gym
Community
Function Room, Entertainment Room
Wellness
Kid's Play Area, Party Lawn
Find your space.
Unit Mix and Sizes
| Type | Size | Units | % of Total |
|---|---|---|---|
| 1 Bedroom + Study | 549-689 sqft | 25 units | 9.1% |
| 2 Bedroom | 678-829 sqft | 50 units | 18.2% |
| 2 Bedroom + Study | 721-872 sqft | 50 units | 18.2% |
| 3 Bedroom | 1,044-1,259 sqft | 50 units | 18.2% |
| 3 Bedroom Dual Key | 915-1,033 sqft | 50 units | 18.2% |
| 4 Bedroom | 1,302-1,884 sqft | 50 units | 18.2% |
| Total | 549-689 sqft+ | 275 residential units and 1 commercial lot | 100% |
Site Plan

Floor Plans (Selected)
Representative plans by unit type. Download the full PDF below for the complete source-derived floor plan pack.






Elevation and Stack Chart

Space beyond your front door.
Facilities
Gallery






Sustainability and Specifications
The source factsheet and brochure describe landscaped community facilities, smart-home provisions and nature-integrated design within the one-north park context; formal green certification was not found in the local source set.
- Source discipline - only available source details are shown.
- Specifications - confirm final appliances, finishes and provisions in the developer sales pack.
- Mobility - MRT, road and neighbourhood access should be checked against current site conditions before purchase.
Understand the numbers.
These are previously published references, not a live price list. Confirm current pricing and availability before relying on them.
Indicative Pricing
The source details.
Project Factsheet
A shareable 2-page PDF snapshot of everything on this page - bring it to viewings, forward it to family.
20. DOWNLOAD PACKDownload the Full Sales Pack
Blossoms By The Park Factsheet
2-page LovelyHomes project factsheet - share with family, bring to viewings.
Download FactsheetFull Floor Plans
Representative and full source-derived floor plans for shortlisting stacks.
Download Floor PlansSite Plan
Actual source site plan image used on this project page.
Download Site PlanDeveloper and Consultant Team
EL Development (Buona Vista) Pte Ltd and EL Development (One-North) Pte Ltd
Blossoms By The Park source materials identify the developer and consultant team below. Buyers should confirm final contractual parties in the official sales documents.
| Architect | ADDP Architects LLP |
| Main Contractor | Evan Lim & Co. Pte Ltd |
| Quantity Surveyor | Evan Lim & Co. Pte Ltd |
| C&S Engineer | E2000 Pte Ltd |
| M&E Engineer | Conteem Engineers Pte Ltd |
| Interior Designer | Design Inck Pte Ltd |
| Landscape Architect | Ecoplan Asia Pte Ltd |
Project Timeline
Page content last updated 11 Sep 2026. Document dates and pricing references may be earlier. A page update does not confirm every project fact.





