
The details, clearly.
- Developer
- Margaret Rise Development Pte Ltd
- Address
- 70 and 72 Margaret Drive, Singapore
- District
- D03
- Tenure
- 99 years from 4 November 2024
- Site Area
- 9,522.30 sqm / about 102,497 sqft
- Plot Ratio
- 4.53 gross
- Blocks and Storeys
- 2 blocks of 40-storey apartments with rooftop garden, basement carpark, 2-storey MSCP, communal facilities and early childhood development centre
- Total Units
- 462 residential units
- Carpark
- Refer to source sales pack
- Expected TOP
- Anticipated handover 1 April 2029; vacant possession no later than 1 April 2031
- Launch date
- Not stated in available source files
- Architect
- ADDP Architects LLP
- Interior Designer
- AXIS.ID Pte Ltd
- Landscape Designer
- Coen Design International
- C&S Consultant
- KCL Consultants Pte Ltd
- M&E Consultant
- United Project Consultants Pte Ltd
- Main Contractor
- Lian Beng Construction (1988) Pte Ltd
A closer look at the neighbourhood.
Location and Connectivity

Schools Nearby
| Primary / Nearby | Queenstown Primary School, New Town Primary School, Gan Eng Seng Primary School |
|---|---|
| Secondary / Tertiary | Alexandra Primary School |
| Distance note | School distance and priority admission should be re-checked against OneMap and current MOE rules before purchase. |
Lifestyle and Amenities
Daily Convenience
Arrival court, Garden alcove
Outdoors
Tennis court, Clubhouse
Dining
Swimming pool zone, Rooftop garden
Retail
Sky dining terrace, Yoga lawn
Community
Children's play zone, Early childhood development centre
Wellness
Refer to source sales pack for the full amenities schedule.
Find your space.
Unit Mix and Sizes
| Type | Size | Units | % of Total |
|---|---|---|---|
| 2 Bedroom Type (2)a | 614 sqft | 76 units | 16.5% |
| 2 Bedroom Premium Type (2)b | 678 sqft | 78 units | 16.9% |
| 3 Bedroom Type (3)a/(3)b | 786-850 sqft | 117 units | 25.3% |
| 3 Bedroom Premium/Yard Type (3)c/(3)d | 936-1,066 sqft | 77 units | 16.7% |
| 4 Bedroom Type (4)a | 1,173 sqft | 76 units | 16.5% |
| 4 Bedroom Premium Type (4)b | 1,281 sqft | 38 units | 8.2% |
| Total | 614 sqft+ | 462 residential units | 100% |
Site Plan

Floor Plans (Selected)
Representative plans by unit type. Download the full PDF below for the complete source-derived floor plan pack.






Elevation and Stack Chart

Space beyond your front door.
Facilities
Gallery




Sustainability and Specifications
BCA Green Mark Platinum Super Low Energy provisional certification, pneumatic waste conveyance and landscaped deck/roof facilities are stated in the source factsheet.
- Source discipline - only available source details are shown.
- Specifications - confirm final appliances, finishes and provisions in the developer sales pack.
- Mobility - MRT, road and neighbourhood access should be checked against current site conditions before purchase.
Understand the numbers.
These are previously published references, not a live price list. Confirm current pricing and availability before relying on them.
Indicative Pricing
The source details.
Project Factsheet
A shareable 2-page PDF snapshot of everything on this page - bring it to viewings, forward it to family.
20. DOWNLOAD PACKDownload the Full Sales Pack
Penrith Factsheet
2-page LovelyHomes project factsheet - share with family, bring to viewings.
Download FactsheetFull Floor Plans
Representative and full source-derived floor plans for shortlisting stacks.
Download Floor PlansSite Plan
Actual source site plan image used on this project page.
Download Site PlanDeveloper and Consultant Team
Margaret Rise Development Pte Ltd
Penrith source materials identify the developer and consultant team below. Buyers should confirm final contractual parties in the official sales documents.
| Architect | ADDP Architects LLP |
| Interior Designer | AXIS.ID Pte Ltd |
| Landscape Designer | Coen Design International |
| C&S Consultant | KCL Consultants Pte Ltd |
| M&E Consultant | United Project Consultants Pte Ltd |
| Main Contractor | Lian Beng Construction (1988) Pte Ltd |
Project Timeline
Page content last updated 11 Sep 2026. Document dates and pricing references may be earlier. A page update does not confirm every project fact.





