The details, clearly.
- Project Name
- The Continuum
- Developer
- Hoi Hup Sunway Katong Pte Ltd
- Address
- 1, 3, 5, 2, 6 and 8 Thiam Siew Avenue, Singapore
- District
- D15
- Tenure
- Freehold / Estate in Fee Simple; airspace bridge lot on 99-year lease from 2 March 2023
- Total Units
- 816 residential units
- Site Area
- 25,083.2 sqm / 269,995 sqft
- Plot Ratio
- 2.8
- Blocks
- 4 blocks of 17 storeys and 2 blocks of 18 storeys
- TOP / VP
- 17 November 2027 (notice of vacant possession)
- Legal Completion
- 17 November 2030 (notice of completion)
A closer look at the neighbourhood.
Location and Connectivity
Paya Lebar / Dakota / Katong access
Location material places the project in the East Coast / city-fringe network.
Katong and Joo Chiat
Dining, conservation streets and East Coast amenities support daily convenience.
District 15 education options
Verify current school distance bands with OneMap before enrolment planning.
ECP / PIE / city routes
City and airport routes are accessible through the East Coast road network.

Schools Nearby
| School Planning | Confirm current school distance bands and eligibility with OneMap and MOE before relying on any school-distance claim. |
|---|
Lifestyle and Amenities
Daily Convenience
Review nearby retail, food, transport and park connections before shortlisting stacks.
Neighbourhood Fit
Compare the surrounding precinct with your commute, school and lifestyle needs.
Viewing Check
Confirm walking routes, traffic patterns and future works during your site visit.
Find your space.
Unit Mix and Sizes
| Bedroom Type | Size / Range | Availability Note |
|---|---|---|
| 1 Bedroom | See floor plans below | Subtype count varies by latest balance-unit list |
| 1 Bedroom + Study | See floor plans below | Subtype count varies by latest balance-unit list |
| 2 Bedroom / 2 Bedroom + Study | See floor plans below | Subtype count varies by latest balance-unit list |
| 3 Bedroom / 3 Bedroom + Study | See floor plans below | Subtype count varies by latest balance-unit list |
| 4 Bedroom | See floor plans below | Subtype count varies by latest balance-unit list |
| 5 Bedroom | See floor plans below | Subtype count varies by latest balance-unit list |
Unit areas and availability may change. Confirm the latest stack, price and size information before shortlisting.
Site Plan

Floor Plans (Selected)
Representative actual floor plans by unit type. The full floor-plan PDF belongs in the download button below this section.





Elevation and Stack Chart
Space beyond your front door.
Facilities
Gallery








Sustainability and Specifications
Specifications, finishes, smart-home provisions and sustainability ratings vary by unit. Refer to the latest developer brochure and sale documents for final approved details.
Understand the numbers.
These are previously published references, not a live price list. Confirm current pricing and availability before relying on them.
Indicative Pricing
1BR + Study, 560 sqft
3BR, 1,076-1,141 sqft
4BR; 5BR from S$5.487M
Available units from S$1.378M; 3BR from S$2.880M, 3BR+Study from S$3.372M, 4BR from S$3.653M, 4BR Premier from S$4.481M and 5BR from S$5.487M. Source: The Continuum public price list updated 7 Mar 2026, accessed 29 Apr 2026.
The source details.
Project Factsheet
A shareable 2-page PDF snapshot of everything on this page , bring it to viewings, forward it to family.
Download the Full Sales Pack
The Continuum Factsheet
2-page project factsheet with key facts, unit mix and buyer notes.
Download FactsheetFull Floor Plans
Selected floor-plan pages and layouts for quick comparison.
Download Floor PlansSite Plan
Site plan showing blocks, facilities and arrival points.
Download Site PlanDeveloper and Consultant Team
Hoi Hup Sunway Katong Pte Ltd
Before committing, verify the latest developer licence, project account details and contractual documents with the appointed sales team.
Project Timeline
| Launch / Sales Phase | Live new-launch project page |
| TOP / Vacant Possession | 17 November 2027 (notice of vacant possession) |
| Legal Completion | 17 November 2030 (notice of completion) |
Page content last updated 30 Apr 2026. Document dates and pricing references may be earlier. A page update does not confirm every project fact.